PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

4th floor Interior Framing Facing West.jpg Constructing the parapet along the high roof Facing West.jpg Continued laying out block at the 3rd floor detention cells Facing North-West.jpg Installed roof curbs at the High Roof Facing West.jpg Installed storm piping at the high roof Facing South-East.jpg Installed temporary lighting at the 4th floor Facing East.jpg Installing storm piping at the 3rd floor Facing North-East.jpg Erecting stone panels at the 4th floor East Elevation.jpg Erecting the stone panels at the East Elevation UCIA Roof 1.jpg
Previous pageNext page Installed storm piping at the high roof Facing South-East
Installed storm piping at the high roof Facing South-East